Pressure Testing

In order to ensure that in the event of a fire that the FM200 gas will not leak out of the room we had to pass a pressure test. This involves installing a fan into the room and sealing the doors so that the room pressure can be monitored and verified. This test took aorund 15 minutes to complete and after completion the room was given a pass.

SL371127

Picture shows the kit used in order to pressure test the room. The red unit in the middle is the fan.

The build is still progressing well, more pictures will follow of under floor installations of cables etc in the coming days.