On Saturday 14th November C4L took delivery of its CRAC units along with the supporting units outside.
The weather made things slightly challenging, but everything eventually fell into place.
The crane used to move everything into place.
The PDU unit being delivered through the hole made in the wall.
A perfect fit for the CRAC unit.
The CRAC unit in its final resting space.
A DX unit being moved into place around the back of County Gates